# Roadmap

LLMS 索引： [llms.txt](/opic-website/llms.txt)

---

# Roadmap

## Current status (2026-09-28)

Requirements baseline v3.2 frozen; materials for 23 capability domains dispatched to 23 capability-center repos (18 existing + 5 new); tech-base `opic-techbase` in place; website first release.

## Modeling phase (next)

Entry requirements: `domain_rules.py` (hard block for zero-approval domains), technical primary key, `domain.object` string carrier, three-variant adapter layer, reverse interface inventory, 30-location count reconciled with full manifest, unilateral declaration whitelist, protocol-commitment ↔ semantic-carrier reconciliation; four execution disciplines.

## Later windows

- **v3.3 change order**: introduce Temporal (durable workflows) and NATS (messaging) — +2 lines in the umbrella mapping, tech-base domain extension, app-domain 1.6.4 mapping, observability consumption declarations.
- **Phase 3 candidate pool**: evaluation-set marketplace & regression service, Agent runtime four-piece deepening, cross-cloud compute scheduling reservation.
